Building Construction 11-12

Month

Content

Performance Standards Addressed

Skills for Student Achievement

Assessment

 

September

·         Intro to class

·         Safety Unit

·         Hand tools

·         Power hand tools

·         Machines

·         Foundation

1,2,3,4,5,6,7,11,12,19,20

·         Understand classroom expectations

·         Develop proper and safe skills for operating hand tools, power hand tools, and machines

·         Calculate footings, foundation and floors

·         Use and leveling instrument to set grade on our block foundation

·         Spot checking rules

·         Safety test

·         Worksheet on calculations

·         Daily timesheet evaluation

·         Instructor spot checking work

October

·         Floor Framing

·              I joist

·              Rim joist

·              Sheathing

·         Exterior wall framing

·              Door openings

·              Window openings

·              Sheathing

10,11,12,20

·         Applied skills:

·              Set floor joist

·              Construct rim joist

·              Calculate stair opening

·              Apply sheathing

·              Layout 2 x 6 plates

·              Build headers

·              Sheathing

·         Quarter 1 Test

·         Self and Instructor evaluation on quality, progress, and employability skills

·         Daily timesheet evaluation

·         Instructor spot checking work

November

·         Roof Framing

·              Rafters

·              Sheathing

·              Shingling

·                   Drip edge

·                   Valley tin

·                   Winter guard

·                   Tar paper

·                   Ridge vent and cap

·         Window Installation

·         Door Installation

10,11,12,20

·         Applied skills:

·              Layout rafters

·              Set rafters (toe-nailing)

·              Sheathing (H clips)

·              Install drip edge

·              Install valley tin

·              Lay down winter guard

·              Staple tar paper

·              Nail ridge vent and cap

·              Shim and nail (square ?)

·              Shim and nail (square ? & locks)

·         Daily timesheet evaluation

      Instructor spot checking              

      work

December

  • Interior wall construction
  •      Door openings
  •      Closet openings
  •      Double top plate
  • Air shoots

10,11,12,20

·         Applied skills:   

·              Layout all walls first

·              Layout plates

·              Frame and nail to floor (plumb)

·              Tie together with double top plate

·              Staple in air shoots

·         Daily timesheet evaluation

·         Instructor spot checking work

January

  • Plumbing
  •      Shower Installation
  •      Sinks
  •      Toilets
  • Electrical
  •       Boxes
  •       Wire
  • Insulation
  • Vapor barrier
  • Cabinets
  •      Kitchen
  •      Bathroom Vanity

10,11,12,20

·         Applied skills:    

·              Cut out floor for drain

·              Set in place (level & plumb)

·              Mark and nail gang boxes

·              Drill holes

·              Run wire

·              Hook up to switches and        receptacles

·              Install insulation

·              Install vapor barrier

·              Construct Cabinets

·                   Plywood

·                   FF

·                   Doors

·                   Drawers

·         Semester Test

·         Self and Instructor evaluation on quality, progress, and employability skills

·         Daily timesheet evaluation

·         Instructor spot checking work

February

  • Sheet rocking
  •      Ceiling
  •      Walls

10,11,12,20

       Applied skills

            Hang ceiling sheet rock   

            Hang wall sheet rock

·         Daily timesheet evaluation

·         Instructor spot checking work

March

  • Lookouts
  • Frieze Molding
  • Soffit
  • Fascia cover

10,11,12,20

       Applied skills

             Construct lookouts

             Mount frieze molding

             Install vented Soffit

             Install fascia cover

·         Quarter 3 Test

·         Self and Instructor evaluation on quality, progress, and employability skills

·         Daily timesheet evaluation

·         Instructor spot checking work

April

  • Siding

10,11,12,20

·         Applied skills

·              Install siding

·         Daily timesheet evaluation

·         Instructor spot checking work

May

  • Hang doors
  • Hang Cabinets
  • Trim

10,11,12,20

·         Applied skills

·              Hang doors

·              Hang cabinets

·              Trim out house

·         Final Test

·         Self and Instructor evaluation on quality, progress, and employability skills

·         Daily timesheet evaluation

·         Instructor spot checking work